Strasburg/Franklin – New Multipurpose Facility


Strasburg/Franklin – New Multipurpose Facility, Strasburg, Ohio


LOCATION

Strasburg, Ohio

Project Highlights
  • CMR contract delivery
  • 12,750 sf pre-engineered metal building
Project Description

Beaver Constructors Inc. was the Construction Manager at Risk for the construction of this $3 million Strasburg-Franklin Local Schools multipurpose addition. The 12,750 square foot pre-engineered metal building houses a gym, weight room, restrooms, and storage. Additionally, the space will be used for batting cages, basketball, and volleyball. Completed in 2023, the addition was designed to integrate seamlessly into their existing facility and empower their students to reach their highest athletic potential.